Columbia Basin Solar & Battery Expansion Phase II – Utility Scale Buildout Fund
Medium Risk

Columbia Basin Solar & Battery Expansion Phase II – Utility Scale Buildout Fund

Expansion-phase solar and battery storage infrastructure fund supporting staged construction and grid interconnection in Washington.

RAISED
$2.5M
TARGET
$12M
EST. YIELD
21.5%
NET YIELD
18.5%
ROI per $10k
$1,850.00
Investor Dashboard REGISTER TO INVEST
Funding Progress 20% (2,450,000 / 12,000,000)

Est. IRR?Estimated annual return rate the project expects to generate on invested capital; based on projected cash flows over the investment term.

21.5%

Estimated Internal Rate of Return

Distributions?Cash payments from the project to investors. Actual payments are based on operating cash flow and your share of the amount invested.

Quarterly

9 Month Build + Ramp Cycle

Post-commission exit window

Infrastructure Development Fund?Regulation type for this offering. It determines who can participate and which compliance standards apply.

Tax Document: 1099-DIV / 1099-B

Investment Limits?The smallest and largest amounts allowed for a single participant investment in this project.

Minimum Investment?The smallest dollar amount you can invest in this project. Your share of cash flow and returns is proportional to this amount. $1,000

How to read this page

Hover or tap the small question marks next to each technical term. Each explanation is written in plain language so you can see what the term means, and how it affects the amount you invest.

Note: Your individual payout is calculated proportionally based on the amount you invest in this project, not on the full project value.

Frank May Farm: Transparent, Cross-Border Renewable Energy Infrastructure Investments

Asset-backed participation in real solar, storage, and agrivoltaic infrastructure

Frank May Farm is an internationally structured operational platform delivering asset-backed participation in real-world solar, storage, and agrivoltaic infrastructure across multiple jurisdictions where legally permitted. Since 2010, the platform has grown from agricultural operations into a vertically integrated infrastructure system supporting over 45,000 MWh of deployed renewable energy, powering 150+ farms and enabling 2,800+ hectares of energy-efficient agriculture across multiple operational regions.

$950M+

Cumulative infrastructure value supported

(equipment + project deployments since 2010)

27.0%

Historical Realized IRR

(across completed portfolios)

180+

Verified export shipments

(cross-border equipment deployment and international operational partnerships)

Investment Allocations

  • Project Equity — 60%
  • Loans to Developers — 25%
  • Cash & Short-term — 15%

Overview

This project finances the second-phase expansion of a utility-scale solar and lithium battery storage facility in the Columbia Basin region. The structure follows a real infrastructure development cycle including land preparation, equipment procurement, installation, grid interconnection, and commissioning. Revenue begins post-commissioning through long-term power purchase agreements with regional utilities. Early-stage returns are lower during construction and ramp significantly after operational stabilization.

Historical Performance (3-Year Average)

0.0%

Realized IRR

6.8%

Avg Dividend Yield

0.3%

Avg Asset Appreciation

Past performance is not indicative of future results.

Cashflow Schedule?Expected project cash receipts over time. Your personal payout is your proportional share of these amounts based on how much you invest.

Month?Month number within the project timeline. Amount ($)?Estimated monthly cash flow for the project. Your investment share is calculated from your portion of the total invested amount.
1 $205.56
2 $205.56
3 $205.56
4 $205.56
5 $205.56
6 $205.56
7 $205.56
8 $205.56
9 $205.56

Location

Columbia Basin, Washington, USA

Assets

Asset Cash Flowing?This asset is generating operating cash. Your share of the cash flow depends on the portion of the project you own.

Risk Management

All projects comply with applicable local, international, and cross-border regulatory requirements in each operating jurisdiction.

Portfolio Timeline

2026-06-15 12:55:27

Phase II expansion initiated with land grading and procurement contracts signed for additional solar arrays and battery storage systems. Equipment staging and grid interconnection planning underway with commissioning timeline on track.

Ready to Invest in the Future of Clean Energy?

Join global participants engaging in structured returns from real-world renewable energy infrastructure projects managed by Frank May Farm.

REGISTER TO INVEST NOW

Ready to Deploy Sustainable Infrastructure?

Browse Equipment Catalog → View Active Projects Register as a Partner