Cascade Agrivoltaic Expansion Phase II – Regenerative Solar & Berry Production Corridor
Medium Risk

Cascade Agrivoltaic Expansion Phase II – Regenerative Solar & Berry Production Corridor

Expansion of integrated agrivoltaic system combining solar generation with high-value berry crop production under regenerative agriculture methods.

RAISED
$3.2M
TARGET
$16M
EST. YIELD
20.8%
NET YIELD
17.8%
ROI per $10k
$1,780.00
Investor Dashboard REGISTER TO INVEST
Funding Progress 20% (3,200,000 / 16,000,000)

Est. IRR?Estimated annual return rate the project expects to generate on invested capital; based on projected cash flows over the investment term.

20.8%

Estimated Internal Rate of Return

Distributions?Cash payments from the project to investors. Actual payments are based on operating cash flow and your share of the amount invested.

Seasonal / Quarterly

10 Month Seasonal Cycle

Post-harvest exit window

Agrivoltaic Infrastructure & Agricultural Yield Program?Regulation type for this offering. It determines who can participate and which compliance standards apply.

Tax Document: 1099-DIV / 1099-B

Investment Limits?The smallest and largest amounts allowed for a single participant investment in this project.

Minimum Investment?The smallest dollar amount you can invest in this project. Your share of cash flow and returns is proportional to this amount. $1,000

How to read this page

Hover or tap the small question marks next to each technical term. Each explanation is written in plain language so you can see what the term means, and how it affects the amount you invest.

Note: Your individual payout is calculated proportionally based on the amount you invest in this project, not on the full project value.

Frank May Farm: Transparent, Cross-Border Renewable Energy Infrastructure Investments

Asset-backed participation in real solar, storage, and agrivoltaic infrastructure

Frank May Farm is an internationally structured operational platform delivering asset-backed participation in real-world solar, storage, and agrivoltaic infrastructure across multiple jurisdictions where legally permitted. Since 2010, the platform has grown from agricultural operations into a vertically integrated infrastructure system supporting over 45,000 MWh of deployed renewable energy, powering 150+ farms and enabling 2,800+ hectares of energy-efficient agriculture across multiple operational regions.

$950M+

Cumulative infrastructure value supported

(equipment + project deployments since 2010)

27.0%

Historical Realized IRR

(across completed portfolios)

180+

Verified export shipments

(cross-border equipment deployment and international operational partnerships)

Investment Allocations

  • Project Equity — 60%
  • Loans to Developers — 25%
  • Cash & Short-term — 15%

Overview

This project expands an existing agrivoltaic installation combining elevated solar PV structures with berry crop cultivation systems in Washington State. The design improves land-use efficiency, reduces evapotranspiration, and enhances soil regeneration through controlled shading and irrigation optimization. Revenue is generated through renewable energy sales and seasonal agricultural harvest cycles, with cashflows aligned to crop yield periods and energy production stability.

Historical Performance (3-Year Average)

0.0%

Realized IRR

6.9%

Avg Dividend Yield

0.3%

Avg Asset Appreciation

Past performance is not indicative of future results.

Cashflow Schedule?Expected project cash receipts over time. Your personal payout is your proportional share of these amounts based on how much you invest.

Month?Month number within the project timeline. Amount ($)?Estimated monthly cash flow for the project. Your investment share is calculated from your portion of the total invested amount.
1 $178.00
2 $178.00
3 $178.00
4 $178.00
5 $178.00
6 $178.00
7 $178.00
8 $178.00
9 $178.00
10 $178.00

Location

Yakima Valley / Sunnyside Basin, Washington, USA

Assets

Asset Cash Flowing?This asset is generating operating cash. Your share of the cash flow depends on the portion of the project you own.

Risk Management

All projects comply with applicable local, international, and cross-border regulatory requirements in each operating jurisdiction.

Portfolio Timeline

2026-06-15 12:56:20

Agrivoltaic Phase II expansion progressing with berry crop replanting and irrigation system upgrades completed. Solar array elevation structures installed and microclimate optimization testing underway ahead of harvest cycle.

Ready to Invest in the Future of Clean Energy?

Join global participants engaging in structured returns from real-world renewable energy infrastructure projects managed by Frank May Farm.

REGISTER TO INVEST NOW

Ready to Deploy Sustainable Infrastructure?

Browse Equipment Catalog → View Active Projects Register as a Partner